We Have A Plan

 
December 6, 2011 posted by admin

It’s been a very successful day.  We’ve pulled the keel bolts, and all the bolts holding in the partners stabilizing the position of the keel.  Here’s a pic of the keel plate.  The two bolts in the middle are what holds the keel in, and in the second slide you can see the gaps around the keel underneath the plate.  There are shims that go in place here that hold everything.  We’ve had a few lengthy discussions with Bristol about how to do the rollover, and we’re good to go first thing in the morning 🙂

Leave a Reply